SCP Contact

Siam Casting Powders Ltd.
SIAM CASTING POWDERS LTD.
If you like to hear a voice at the other end, we're there for you with everything you need.

SCP - TECHNICAL DATA

Jewellery Trouble Shooting Mould Rubber Problems

Cut mould does not seal Evenly (warping)

REMEDY :
Use new rubber.

REMEDY :
Ensure the work time is fully used.
Normally 8 minutes.

REMEDY : Review mould packing procedure. Lay strips in same direction.

Voids in mould (air entrapment)

REMEDY :
Pack rubber pieces into and around modle.

REMEDY : Preheat vulcaniser to 155 C.
REMEDY : Tighten vulcaniser ½ turn past first resistance. Repeat every two minutes until platens are in contact with frame and handle cannot be turned without resistance. Allow 15 minutes at 155 C for every 6 mm. for intricate moulds allow 20 minutes at 145 C for every 6 mm.

Mould delaminates after curing

REMEDY : Use new strips. Do not contaminate surfaces with hands and protect from extraneous dirt or dust.
REMEDY : Use new rubber.
REMEDY : Use correct times and temperatures.

Mould soft and sticky in centre

REMEDY : Check temperature of platens.
REMEDY : Cure for 15 minutes for every 6 mm.

Mould has pebbly surface.Mould is sticky and scorched. Excessive shrinkage. Lack of flexibility.

REMEDY : Check calibration of vulcaniser.